Project
Replaced 11,390 LF of wet seal glazing assemblies and perimeter sealants including curtainwall, storefront, operable punched windows, and entrance doors. Repointed all limestone mortar joints on building totaling 10,800 LF. Repaired damaged soffits at east elevation entrances and added flashing with drip edge at overhead limestone bands. Removed and replaced sealant at railing post pockets throughout property. Granite monument sign repair. Regraded east elevation entrances.
Account Executive
Joe Baumgartner
Date
February 9, 2021
Project Size
11,390 LF
Group
General Contracting
Division
Capital Projects
Superintendent
Justin Robinson
Project Duration
5 months
Location
Chantilly, VA
Tags
General Contracting Group